National Uncategorized

ROAD REPAIRS; MARINE BEACH BRIDGE APAPA TO BE SHUT

By Olubunmi  ISOKPEHI, Lagos

 

In view of the ongoing road maintenance and repairs in Apapa axis of Lagos State, the Federal Controller of roads in Lagos State, Mr.Kayode Popoola, has said, “The Marine Beach Bridge in Apapa would be shut for repairs “next week.”

Popoola  disclosed this information in a chat with news men in Lagos.

He said, ” The contractor, buildwell Nigeria Limited, was already on site to begin replacement of damaged expansion joints and bearing on the bridge.”

Adding, ” The contractor delayed commencement on the repairs on the bridge till next week because ongoing patching of adjoining roads to the bridge to avert gridlock.”

He asserted, “I just came back from inspecting the marine beach bridge now .The contractor is set to begin work, but we want them to finish with repairs of the adjoining roads before starting on the bridge.”

Popoola posited, ” Next week ,we are going to close the bridge and then the contractor will start.  The contractor is at the moment patching the roads, adding stone base and some cement to make sure the roads are stable during this period of the rainy season.”

He continued, ” We are going to replace the expansion joints and bearings and also do the jacketing of the piers on the bridge. That means that we are going to surround it with reinforcement and put fresh concrete.”

Adding, ” The beam of the bridge will be lifted up so that we can see all the bearings very well to change the bad ones.”

His words: ” We are going to work on about 45meters on both carriageway and move traffic to it before we continue on the next bound.”

However, he said, ” A traffic management architectural was being evolved in conjunction with traffic regulatory agencies and law enforcement agencies to avert gridlock and hardship to road users.”

Popoola,thus, appealed for understanding of roads users during the construction to ensure speedy completion of repairs works on the bridge .Adding, ” Repairs works usually come with some discomfort to ensure smooth rides and begged motorists to comply with construction zone guidelines during the closure.”

Leave a Reply

Your email address will not be published. Required fields are marked *